ZAZIBONA

What is the waiting period after requesting for an inspection?

The initiative conducts product-based inspections to support product registration, generally facilities are inspected within 6 months from the time of initial dossier review. However, it should be noted that ZaZiBoNa inspections are scheduled quarterly with 3-4 facilities being considered in each inspection schedule.