ZAZIBONA
+263-242-736981/5
sakhi.vee@gmail.com
106 Baines Ave, Hre
The target time from the start of a GMP inspection to conclusion after review of the corrective and preventive action (CAPA) is 90 days.
The figure below classifies the GMP inspections conducted onsite between 2014 and 2022 by outcome / status
The figure below classifies the desk reviews conducted between 2014 and 2022 by outcome